Modulex Steel Framing (SFS): India’s Smarter Way to Build

Fast, precise, and future-ready steel framing solutions—engineered to transform the speed, quality, and reliability of your construction projects.

Why Choose Modulex?
Offsite Innovation, Onsite Impact
The Challenge with Pure Traditional Methods
Brick-and-mortar methods, while familiar, are time-intensive, labour-dependent, and prone to variability. Project delays, uneven finishes, and rising costs often compromise efficiency and ROI. In high-density urban settings or fast-track projects, these limitations become even more pronounced.
The Modulex Solution
Modulex Steel Framing brings precision-engineered, factory-manufactured frames directly to your site. Our offsite-first approach reduces construction time, improves predictability, and ensures consistent quality. Designed to integrate seamlessly with RCC, masonry, or hybrid methods, Modulex delivers the smarter, faster way to build.
Benefits
Proven Benefits. Tangible Results.
Accelerated Timelines
Offsite manufacturing and rapid on-site assembly cut project schedules by up to 50%.
Predictable ROI
Faster handovers enable earlier occupancy, sales, or rental income.
Engineering Precision
BIM-enabled design reduces human error, ensuring perfect alignment and minimal rework.
Consistent Quality
Factory-controlled production guarantees repeatable results across projects.
Seamless Integration
Works effortlessly with RCC and masonry for hybrid builds.
Sustainable Impact
Lower material waste, recyclable steel, and cleaner construction sites.
Technical Overview
How Modulex Kits Work Smarter
Core Features
BIM-Integrated Design
Every frame digitally modelled for accuracy before production.
Lightweight Strength
High-strength steel ensures durability without adding excess load.
Flexible Configurations
Wall panels, roof trusses, and floor cassettes tailored to project needs.
Fire & Weather Resistance
Designed to withstand India’s diverse climate and safety standards.
Eco-Friendly Materials
Up to 30% less waste compared to conventional brick/block construction.
Local Manufacturing Capacity
Global-standard production facilities within India ensure speed and scale.
BIM-Integrated Design
Every frame digitally modelled for accuracy before production.
Lightweight Strength
High-strength steel ensures durability without adding excess load.
Flexible Configurations
Wall panels, roof trusses, and floor cassettes tailored to project needs.
Fire & Weather Resistance
Designed to withstand India’s diverse climate and safety standards.
Eco-Friendly Materials
Up to 30% less waste compared to conventional brick/block construction.
Local Manufacturing Capacity
Global-standard production facilities within India ensure speed and scale.
Use Cases
Designed for Diverse Applications

Commercial Housing
Staff, student & worker accommodations
Know More
Educational Institutions
School and hostel applications
Know More
Hospitals
Pods with medical-grade finishes
Know More
Corporate Offices
Integrated washrooms for quick deployments
Know More
Hostels, Student Accommodations, Co-Living Spaces
Standard bathroom layouts
Know More
Retail
Food kiosks, single-unit F&B retail pods
Know MoreInstallation Workflow
Seamless Installation. Zero Hassle.
06
Completed
- 01
- 02
- 03
- 04
- 05
- 06
STEP 1: Design & Project Assessment
BIM-enabled design finalised for structural accuracy and seamless integration.
STEP 2: Precision Manufacturing
Steel members roll-formed and cut to exact specifications in a controlled factory.
STEP 3: Quality Checks & Pre-Assembly
Frames tested and, where required, pre-assembled for faster installation.
STEP 4: Sequenced Delivery
Bundled and labelled frames delivered just-in-time to reduce site disruption.
STEP 5: On-Site Erection
Frames fixed using engineered connections, speeding up installation with minimal equipment.
STEP 6: Integration & Handover
Cladding, MEP, and finishes added; final inspection and documentation provided.
STEP 1: Design & Project Assessment
BIM-enabled design finalised for structural accuracy and seamless integration.
STEP 2: Precision Manufacturing
Steel members roll-formed and cut to exact specifications in a controlled factory.
STEP 3: Quality Checks & Pre-Assembly
Frames tested and, where required, pre-assembled for faster installation.
STEP 4: Sequenced Delivery
Bundled and labelled frames delivered just-in-time to reduce site disruption.
STEP 5: On-Site Erection
Frames fixed using engineered connections, speeding up installation with minimal equipment.
STEP 6: Integration & Handover
Cladding, MEP, and finishes added; final inspection and documentation provided.
FAQ
Everything You Want to Know About Building Smart

Let’s Modularise Your Next Project.
Whether you are delivering housing at scale, expanding retail infrastructure, or setting up institutional kits, Modulex gives you the edge to build faster, safer, and without surprises.